Bathroom Fitting in Dunfermline
Full bathroom installs in Dunfermline, in historic stone properties and across the modern estates.

What the work looks like in Dunfermline
Bathrooms in Dunfermline's old town are usually a room that was converted rather than designed, so the pipework has taken an interesting route to get there. Stripping back to bare walls first tells us what we're inheriting — and whether the boards behind the old tiling have quietly been taking water.
New plumbing is set out to suit the layout, walls are boarded flat and shower areas tanked before tiling. On a stone-built property that flat, true substrate is doing a lot of work: it's what lets a tiled wall read straight in a room where nothing else is.
Tiles are set out from the eye line, cuts pushed to the corners, grout kept consistent, edges trimmed. Then the finishing — extractor working, silicone clean, waste falls correct, flooring laid tight and everything tested. Modern estate bathrooms follow the same process with fewer surprises. It's 35–40 minutes over the bridge, so we run these as consecutive days.
What's included
- Full bathroom installs from strip-out to final silicone bead
- Tiling set out properly, with cuts kept in the corners
- Plumbing first and second fix, done as part of the job
- Finishing — clean edges, working extractor, watertight throughout